  • Draft Design Approach Document

    Draft Policy Compliance Document

  • CHAPTERS

    Lostrigg Solar Non – Technical Summary

    PEIR Chapter 0 - Contents, Glossary and Acronyms

    Chapter 1 – 4 Introductory chapters

    Chapter 5 - Agricultural land and soils

    Chapter 6 - Biodiversity

    Chapter 7 - Climate change

    Chapter 8 - Cultural Heritage

    Chapter 9 -  Landscape and Visual 

    Chapter 10 - Noise and Vibration

    Chapter 11 - Socioeconomics

    Chapter 12 - Water resources and flood risk

    Chapter 13 - Cumulative effects assessment and summary

    APPENDICES

    Appendix  A-1 Scoping Report

    Appendix A-2  Scoping Opinion

    Appendix A-3  Scoping Opinion response matrix

    Appendix A-4  Agricultural land classification report

    Appendix A-5  Habitat Survey Report

    Appendix A-6  Bat survey report

    Appendix A-7  Breeding Bird Survey Report

    Appendix A-10 Great Crested Newt eDNA Report 

    Appendix A-11 Invertebrate survey report

    Appendix A-12 Habitat Regulations Assessment stage 1

    Appendix A-13 Arboricultural impact assessment

    Appendix  A-14 Climate change Supporting Information

    Appendix A-15 Geophysical survey report

    Appendix A-16 LVIA Methodology

    Appendix A-17 Landscape baseline and effects

    Appendix A-18 Visual baseline and effects

    Appendix A-19 Legislation, policy and guidance

    Appendix A-19a Workington Solar Farm, Landscape and Visual Appraisal

    Appendix A-20 Policy Legislation and Guidance

    Appendix A-21 Noise monitoring data

    Appendix A-22 Flood risk assessment

    Appendix A-23 Drainage strategy

    Appendix A-24 WFD / WER compliance assessment

    Appendix A-25 Long and Short List of Committed Developments

    Appendix A-26 In-combination effects Table

    Appendix B-1  Transport statement

    Appendix B-2  Coal mining risk assessment

    Appendix B-3  Construction dust assessment

    Appendix C-1  Outline Construction Environmental Management Plan

    Appendix C-2 Outline Construction Traffic Management Plan

    Appendix C-3 Outline Soil Resources Management Plan

    Appendix C-4 Outline Battery Fire Safety Management Plan

    Appendix C-5 Outline Landscape and Ecological Management Plan

    Appendix C-6 Outline Public Rights of Way Management Plan

    Appendix C-7  Outline Decommissioning Environmental Management Plan

    FIGURES

    Figure  1.1 Draft Order Limits

    Figure  1.2 Layout of Proposed Development

    Figure  2.1 Preliminary design of Northern Panel Area

    Figure  2.2 Preliminary design of Central Panel Area

    Figure  2.3 Preliminary design of Southern Panel Area

    Figure 2.4 Outline Environmental Masterplan

    Figure 2.5 Key environmental designations

    Figure  2.6 Typical fixed solar panel

    Figure  2.7 Typical hybrid pack

    Figure  2.8 Typical customer switchgear

    Figure  2.9 Typical substation

    Figure  2.10 Typical pylon and PoC mast

    Figure  2.11 Typical fencing

    Figure  2.12 Typical CCTV pole

    Figure  5.1 Provisional Agricultural Land Classification

    Figure  5.2 Soil Associations

    Figure  5.3 Agricultural land classification survey - Panel Areas

    Figure  6.1 Site location plan

    Figure  6.2 Statutory designated sites

    Figure  6.3 Non-statutory designated site

    Figure  6.4 Waterbody location plan

    Figure  6.5 Provisional habitat plan

    Figure  6.6 Provisional priority habitat map

    Figure  6.7 Invasive species location plan

    Figure  8.1 Designated Heritage Assets

    Figure  8.2 Non-designated Heritage Assets

    Figure  9.1 Site location, study area and search area

    Figure  9.2 Topography and Hydrology

    Figure  9.3 Landcover and vegetation patterns

    Figure  9.4 Tranquillity baseline

    Figure  9.5 Landscape designations

    Figure  9.6 Landscape Receptors

    Figure  9.7 Representative viewpoint and Zone of Theoretical Visibility

    Figure  9.8 Photosheets and visualisations Part 1

    Figure  9.8 Photosheets and visualisations Part 2

    Figure  10.1 Sensitive receptor plan

    Figure  10.2 Noise monitoring location plan

    Figure  10.3 Solar Panel Construction noise buffer plan

    Figure  10.4 Cable route construction noise buffer

    Figure  10.5 Operational noise contours

    Figure  11.1 Study area

    Figure  11.2 Other land uses

    Figure  11.3 Public Rights of Way

    Figure  11.4 Community and Recreational Facilities

    Figure  12.1 Surface water features

    Figure  12.2 Bedrock geology sheet 1

    Figure  12.2 Bedrock geology sheet 2

    Figure  12.3 Superficial geology sheet 1

    Figure  12.3 Superficial geology sheet 2

    Figure  12.4 Groundwater designations

    Figure  12.5 Licensed abstractions

    Figure  12.6 Risk of flooding from surface water

    Figure  12.7 Risk of flooding from Rivers and Sea

    Figure  12.8 Flooding from groundwater

    Figure  12.9 LiDAR Topography

    Figure  12.10 Water receptor surface status

    Figure  13.1 Long list committed developments

    Figure  13.2 Short list committed developments

    Figure  14.1 Construction Dust Receptor Plan

Lostrigg Solar

Contact us

We have set up a range of communications should you wish to get in touch.

You can contact the community relations team by emailing consultation@lostriggsolar.com, calling 0808 164 0799 (9am – 5pm; Monday – Friday), or sending a letter to FREEPOST LOSTRIGG SOLAR.

PRIVACY POLICY
Powered by
Counter Context